Carl Peterson  › Portage Lakes DGC   May 26, 2011 at 5:58am

We have a work day on Saturday, May 28, from 8:30 to 12:00, with a round of golf afterward.

Areas that still need work include: Move brush piles to widen #16. Take down marked trees on #9, 14 and 15. Cut up fallen trees on #18 and 6. Dig basket holes on #14, 15 and #16 (the State will do the others, once it stops raining). Set the bricks on the back 9 tees.
We have enough concrete for about 4 baskets. If you can pick up broken bags at Home Depot/Lowes, etc. for 1/2 price, that would help. We need about 15 more 60-80 lb. bags.