Brad Silvers  › Riverside Park   January 31, 2018 at 6:22am

This may become a reality really soon. Funds are in place to purchase 12 baskets of which 9 will be installed as the Original 9 in the park. Early idea of the other 3 is 1 being installed in position of future basket for Hole 18 and practice basket for the time being as well as having the ability to easily remove for use with other 2 baskets which will be stored for Temp Holes setup for a tournament. Additional funds for full Back 9 may then be raised while the Back 9 is created while having the ability to play the Original 9 year round. The baskets being installed may or may not be the permanent baskets for the course but will be PDGA approved for tournament play. More info Early Spring 2018 with a target date no later than May 1st.