Scott Campbell  › The Grassman at West Branch State Park   April 14, 2015 at 6:10am

Did some measuring for the long tee areas, and it looks like everything should work out great. There should be plenty of room around each long tee and not much leveling to do. Hole 1, 6, 11, 14 need some leveling. Holes 1 and 14 will need small walls built to create a level surface. I already have the supplies I need to do most of the leveling. ( tee pad frames are being build and a crushed asphalt base will be under each tee. Most of the tees will be put on top of the ground and a large surface area will be build up around the the cement to keep water and mud runoff from covering the tees. I will be doing most of the work on monday nights after 6pm and anyone would like to help. Occasionally I will be having weekend workdays. This Sunday, April 19 will be the first workday. I will be there around 1:00pm

Jay Kovach   April 14, 2015 at 9:02am

I'll try to make it