Disc-Van-Go Players Shuttle   March 26, 2015 at 5:05am

Locks Approach Work Party Sat&Sun April 4th&5th

We will have line and hedge trimmers for the un mowable fairways, new stakes for hole 5 OB, as well as lumber to start framing new course sign AND general maint. tools to ready the course for the upcoming dubs season and the Lock Robster tourney(may 2nd&3rd). Please call to confirm(we may have something offered be the local community for those attending, may need head count)
NOTE: We now have a practice basket!
PLEASE SHARE FOR THOSE THAT MAY WISH TO HELP! THANKS!!!

Nick Orr   March 26, 2015 at 6:52pm

ill be there for sure. I have some basic tools to throw in also. trimmers, shovels, beer, and four poisonous cobras. WE MUST fix up hole 9. Fun hole, but not very competitive. We need a line for a park job a player can claim. And i will PERSONALLY remove all those damn stickers on the green of 14. with bare hands. naked.

D.C. Dan Dulaney   March 27, 2015 at 4:20pm

Sweet Nick! The row of stickers we are keeping, we just need to get ALL the runners that grow along the ground. Leaving a row keeps the green interesting. We just haven't had the man power to go in and be thorough, and just buzz the runners on the ground. The 4th and 5th we are working on hole 5, re-setting the OB and getting the roughs thinned, and poss moving onto hole 6&7.

Nick Orr   March 27, 2015 at 8:42pm

Sounds good dude. I dig most of the stickers in play. Hole 15 is awesome. 14 just pisses me off. Hahaha! Great course man! Ill be there on Saturday!