Consttruction work on campus has interrupted a few holes, we are working on it with the dean of students to get the use baskets put back in as soon as possible
I work in housing at Lawrence. I found the basket for 18 laying outside the door so we pulled it inside so it wont get stolen. the basket for 16 is under a pile of dirt and 17 is still intact but unplayable. The course will need lot of work. Although I played it today and the rest of the course is doing well. We need new tee signs and eventually pads.
Consttruction work on campus has interrupted a few holes, we are working on it with the dean of students to get the use baskets put back in as soon as possible
used*
It looks like the construction will be ongoing for the next 2-3 months
I work in housing at Lawrence. I found the basket for 18 laying outside the door so we pulled it inside so it wont get stolen. the basket for 16 is under a pile of dirt and 17 is still intact but unplayable. The course will need lot of work. Although I played it today and the rest of the course is doing well. We need new tee signs and eventually pads.