1thru 15 covered in 3-4 inches salted at end of pads......16-24 burried in 16 inches.Very deep snow on the course but playable.
thanks for the report, next time bring a shovel
lol
It's going to take more than a measly shovel to excavate the pads.Going to have to call in a archeology team to dig out those pads.
A blow torch and a lot of patience could clear the shorts. Two months or a nuclear accident could clear the longs. How effective would a single shovel be? Might as well bring a spoon.
thanks for the report, next time bring a shovel
lol
It's going to take more than a measly shovel to excavate the pads.Going to have to call in a archeology team to dig out those pads.
A blow torch and a lot of patience could clear the shorts. Two months or a nuclear accident could clear the longs. How effective would a single shovel be? Might as well bring a spoon.