Hunter S. Dotson  › 24 Cha!ns Summer 2012   August 22, 2012 at 10:21pm

We need to hold a work day out at WaterWorks and tend to some of the fallen trees in the woods. See if we can find some of the missing Picnic tables and such. I was thinking about holding a work day Sept 8 th or 9 th. Any thoughts from the group would be great. The main goal of this work day would be to work in groups and sweep each hole for dead and fallen trees, Clear out what was once a fire pit on hole 5 and inlay some paver bricks for the tee pads on the open holes.